Potomac Family Dental

Woodbridge, VA

Tenant Fit-out shall include: Demolition and removal of existing partitions, built-in counters, plumbing fixtures, and plumbing lines to be capped as required. Demo all flooring and remove existing lights. Construct new partitions; install mechanical, plumbing and coordinate electrical as per plan and specification. Relocate 30 sprinkler heads as required. Install acoustical ceilings, carpet, vinyl and ceramic flooring as per plan and specification. All partitions and select ceilings to have sheetrock finished and painted. Install all doors, hardware and millwork as per plans and specification. KCI to install owner supplied cabinets from IKEA and custom made cabinets to include operatory and reception. KCI shall provide all counter tops as per plan and specification. KCI shall coordinate with all dental suppliers/manufactures for the correct placement of all plumbing and electrical. KCI Design/Build shall construct Potomac Mills Family Dental per the approved construction documents to include: project plans, approved M/E/P documents and dental equipment manufactures specifications.

Potomac Family Dental